In a statement Thursday, BP did not dispute the report’s specifics. He also said BP’s well-site leader was not present, as he should have been, during a critical test known as a negative pressure test that indicated something was wrong.īartlit’s report is the latest of a series from the National Commission on the BP Deepwater Horizon Oil Spill and Offshore Drilling, which has already faulted a variety of factors, including decisions made by the well operator BP, rig owner Transocean, oil service provider Halliburton and federal regulators. Bartlit Jr., a prominent trial lawyer, said that for three years BP had been aware of problems with lab tests of Halliburton cement that a reorganization of BP’s engineering department resulted in delays and that BP decided not to set a lockdown sleeve, an installation deep in the well, during its preparations for temporary abandonment in order to save 5 1 / 2 days and $2 million in costs. But he also points to flaws in Halliburton’s work and errors by rig owner Transocean.įred H. The chief counsel of the presidential oil spill commission has issued a final report laying considerable blame on BP for last year’s disaster in the Gulf of Mexico.
0 Comments
Leave a Reply. |